Managing High Water Tables in Dubai and Abu Dhabi Arabian Equipment’s Proven Dewatering Methods

AER - Arabian Equipment Staff

10 Dec 2025

How Arabian Equipment Supports Contractors with Reliable Groundwater Control Across Dubai and Abu Dhabi

High water tables are one of the biggest challenges faced by contractors in Dubai and Abu Dhabi. Many sites sit close to sea level, contain permeable sandy soils and experience constant groundwater inflow. Without proper management, high water tables can lead to flooding, unstable soil, excavation collapse and serious delays in construction schedules.

Arabian Equipment provides proven and efficient dewatering methods designed specifically for UAE conditions. Their systems ensure safe, dry and stable excavation zones even in areas with severe groundwater pressure.


Why High Water Tables Are a Major Issue in the UAE

Dubai and Abu Dhabi have unique geological and environmental conditions that make groundwater management essential. Contractors frequently encounter:

  • Rapid groundwater inflow

  • Waterlogged excavations

  • Weak or shifting soil

  • Delays in piling and foundation works

  • Difficult concrete placement

  • Increased safety risks

  • Unexpected flooding during seasonal rain

Proper dewatering from Arabian Equipment prevents these issues and keeps projects moving as planned.


Arabian Equipment’s Proven Dewatering Methods
1. Wellpoint Dewatering Systems

Wellpoint systems are ideal for shallow to medium depth excavations and for sandy or silty soil conditions common in Dubai and Abu Dhabi. Arabian Equipment designs wellpoint systems that:

  • Lower groundwater evenly across the excavation

  • Reduce soil instability

  • Provide continuous flow control

  • Enable faster and safer excavation

Wellpoints are especially effective for infrastructure trenches, foundations and basement works.

2. Deep Well Dewatering Systems

For deep excavations or sites with high inflow, deep well systems are often required. Arabian Equipment installs deep wells with submersible pumps that:

  • Lower water tables to significant depths

  • Handle high pumping volumes

  • Provide stable control over large excavation areas

Deep wells are commonly used for towers, multi-level basements and major infrastructure projects.

3. Submersible Pump Dewatering

Submersible pumps offer flexible and reliable water removal for:

  • Confined spaces

  • Emergency flooding

  • Rapid water buildup

  • Areas unsuitable for wellpoints

Arabian Equipment provides a wide range of submersible pumps matched to site conditions to ensure stable and consistent water removal.

4. Combination Dewatering Systems

Many UAE projects require a combination of methods due to mixed soil layers or uneven groundwater behaviour. Arabian Equipment designs blended solutions that may include:

  • Wellpoints for upper layers

  • Deep wells for deeper zones

  • Submersible pumps for rapid removal

This ensures total groundwater control across the entire excavation.


How Arabian Equipment Ensures Dewatering Success
Accurate Site Assessment

Arabian Equipment begins with detailed groundwater and soil evaluation to determine the correct dewatering method and layout.

Engineering Based Design

Every system is designed using real soil data, flow rate calculations and required drawdown levels.

Correct Pump Sizing

Pump capacity is selected to manage continuous groundwater inflow without interruption.

Safe and Compliant Water Discharge

Arabian Equipment plans legal and environmentally responsible discharge routes for all pumped water.

Continuous Monitoring and Support

Site visits, equipment checks and on-site assistance ensure the system remains stable throughout the project.


Where High Water Table Management Is Critical in Dubai and Abu Dhabi
Basement Construction

Multiple basement levels in towers require strong groundwater control.

Infrastructure Projects

Road tunnels, utilities and pipeline corridors depend on stable dewatering.

Foundation Works

Ground stability must be maintained for piling and raft foundation construction.

Coastal Developments

Projects near the shoreline experience major groundwater pressure and must be managed correctly.

Emergency Pumping

Unexpected water surges require rapid dewatering support to protect active work areas.


Why Contractors Trust Arabian Equipment

Arabian Equipment is a preferred dewatering partner across Dubai and Abu Dhabi because they provide:

  • Proven and reliable dewatering systems

  • Engineering level designs

  • High performance pumps and equipment

  • Fast mobilisation and installation

  • Skilled technicians and 24-hour support

  • Full compliance with local regulations

Their experience ensures effective groundwater control even in the most challenging high water table conditions.

Managing high water tables is essential for safe and efficient construction in Dubai and Abu Dhabi. With proven dewatering methods, accurate design and dependable equipment, Arabian Equipment ensures contractors maintain stable excavation zones and avoid costly delays.


Greyblue-faded-background-three-.jpg

READY TO DISCUSS YOUR NEXT PROJECT?

THANKS FOR YOUR ENQUIRY,
ONE OF OUR TEAM WILL BE IN TOUCH...

OR, IF YOU PREFER, SEND US A MESSAGE HERE 
AND ONE OF OUR EXPERT TEAM WILL GET BACK TO YOU SHORTLY. 

new-footer.jpg

Arabian Equipment Rental (AER)

HEAD OFFICE

Office 232

2nd Floor, Zone-2

Central Plaza Building

Schon Business Park

Dubai Investment Park 1

Dubai • United Arab Emirates

bottom of page