A Step by Step Look at How Arabian Equipment Controls Groundwater on Challenging UAE Construction Sites

High water tables are a constant challenge for construction projects in Dubai and Abu Dhabi. Coastal geography, sandy soils and deep excavations mean groundwater can quickly flood sites, weaken soil and cause serious delays if not managed correctly. Designing an effective dewatering system requires engineering precision, local experience and reliable equipment.

Arabian Equipment specialises in designing dewatering systems specifically for high water table conditions in the UAE. Their approach ensures stable excavations, safe working conditions and uninterrupted construction progress.


Understanding High Water Table Conditions in Dubai and Abu Dhabi

In many areas of Dubai and Abu Dhabi, groundwater lies close to the surface. Excavation can expose pressurised water that flows rapidly through permeable soil layers. Without a proper dewatering system, contractors face:

  • Continuous water inflow

  • Unstable excavation walls

  • Soil erosion and settlement

  • Delays in foundation and concrete works

  • Increased safety risks

Arabian Equipment designs systems that control water flow before excavation begins.


How Arabian Equipment Designs Dewatering Systems
1. Detailed Site and Groundwater Assessment

The design process starts with analysing groundwater levels, soil permeability and excavation depth. Arabian Equipment reviews soil reports, site data and existing groundwater readings to understand how water will behave during excavation.

2. Selection of the Most Effective Dewatering Method

Based on site conditions, Arabian Equipment selects the most suitable system. This may include:

  • Wellpoint systems for shallow and permeable soils

  • Deep well systems for deeper excavations and higher inflows

  • Submersible pump solutions for confined or flooded areas

Choosing the correct method is essential for controlling high water tables efficiently.

3. Calculating Required Drawdown

Arabian Equipment determines how much the groundwater level must be lowered to create a dry and stable excavation. This calculation ensures the system achieves sufficient drawdown without over pumping.

4. Designing Wellpoint or Deep Well Layouts

Engineers calculate:

  • Number of wellpoints or wells

  • Spacing between units

  • Depth of installation

  • Header pipe routing

Accurate layout design ensures even groundwater lowering across the site.

5. Selecting Correct Pump Capacity

Pump size is matched to expected inflow rates and system layout. Arabian Equipment ensures pumps can operate continuously without overload or failure.

6. Planning Safe and Compliant Water Discharge

Water discharge is designed to meet local environmental requirements. Arabian Equipment plans discharge routes, filtration methods and flow control to avoid site flooding or regulatory issues.

7. Including System Redundancy and Monitoring

Backup pumps, standby power and monitoring points are included to protect against unexpected inflow or equipment failure.


Installation and Ongoing System Management

After design approval, Arabian Equipment supports installation and system setup. The team monitors performance, adjusts pump operation and ensures groundwater remains controlled throughout excavation.


Where Arabian Equipment Dewatering Systems Are Most Effective
Basement Excavations

High rise developments often require multiple basement levels with continuous groundwater control.

Infrastructure Projects

Tunnels, utilities and pipeline corridors depend on stable and dry working conditions.

Foundation and Piling Works

Stable soil is essential for accurate and safe structural installation.

Coastal Developments

Projects near the shoreline face constant groundwater pressure and require specialised design.


Why Contractors Trust Arabian Equipment in Dubai and Abu Dhabi

Contractors rely on Arabian Equipment because they deliver:

  • Engineering based dewatering designs

  • Proven performance in high water table conditions

  • High quality pumps and systems

  • Fast mobilisation and technical support

  • Continuous site monitoring

  • Full compliance with UAE safety and environmental standards

Their experience ensures reliable groundwater control even in the most challenging conditions.

Designing dewatering systems for high water tables in Dubai and Abu Dhabi requires local knowledge, precise engineering and dependable equipment. Arabian Equipment follows a structured and proven design process that ensures groundwater is controlled safely and efficiently throughout construction.

With expert planning, accurate calculations and ongoing support, Arabian Equipment helps contractors maintain dry and stable excavation zones and avoid costly delays.

Greyblue-faded-background-three-.jpg

READY TO DISCUSS YOUR NEXT PROJECT?

THANKS FOR YOUR ENQUIRY,
ONE OF OUR TEAM WILL BE IN TOUCH...

OR, IF YOU PREFER, SEND US A MESSAGE HERE 
AND ONE OF OUR EXPERT TEAM WILL GET BACK TO YOU SHORTLY. 

new-footer.jpg

Arabian Equipment Rental (AER)

HEAD OFFICE

Office 232

2nd Floor, Zone-2

Central Plaza Building

Schon Business Park

Dubai Investment Park 1

Dubai • United Arab Emirates

bottom of page