

AER - Arabian Equipment Staff
29 Oct 2025
Arabian Equipment [AER] Delivers Reliable Groundwater Control Solutions That Strengthen and Protect UAE Construction Projects
Abu Dhabi’s construction industry is defined by large-scale infrastructure, real estate, and oil and gas developments that demand precision, safety, and structural stability. One of the most crucial processes that make these projects possible is site dewatering, the controlled removal of groundwater from excavation areas.
With high water tables and sandy soils, dewatering in Abu Dhabi is essential for creating safe, stable foundations. As a trusted expert, Arabian Equipment [AER] provides advanced dewatering systems that protect structures, enhance site safety, and keep projects on schedule.
Why Dewatering Is Essential for Safe Foundations
Groundwater poses serious challenges during excavation and foundation work. Without proper control:
Excavations can flood, causing work delays and hazards.
Excess moisture weakens the soil, reducing its load-bearing capacity.
Hydrostatic pressure may damage or shift foundations.
Unstable ground can lead to settlement and structural cracking.
By lowering the groundwater table, AER’s dewatering systems ensure the soil beneath a structure remains compact, dry, and capable of supporting heavy loads safely.
How AER’s Dewatering Solutions Improve Foundation Safety
1. Stabilising Soil Conditions
AER uses wellpoint and deepwell dewatering systems to draw groundwater away from the excavation area. This stabilises the soil, reducing the risk of collapse and ensuring a secure base for construction.
2. Preventing Hydrostatic Pressure
By maintaining controlled water levels, AER prevents upward hydrostatic pressure that can damage slabs and footings, protecting both temporary works and permanent structures.
3. Enhancing Worker Safety
Dry excavation sites minimise slip hazards and equipment risks. Arabian Equipment [AER] prioritises worker safety by ensuring clean, dry, and stable work environments throughout every phase of construction.
4. Reducing Delays and Rework
Flooded excavations and unstable ground often cause costly rework. AER’s reliable, round-the-clock pumping systems keep sites dry and projects moving forward without interruption.
5. Compliance with Safety and Environmental Standards
All AER dewatering operations adhere to UAE health, safety, and environmental guidelines, ensuring sustainable water discharge and responsible groundwater management.
Why Contractors in Abu Dhabi Choose Arabian Equipment [AER]
Proven experience in complex foundation dewatering projects
Modern fleet of pumps and wellpoint systems
Fast mobilisation and on-site technical support
24/7 monitoring and maintenance
Full compliance with UAE safety regulations
Applications of AER Dewatering Systems
High-rise and commercial foundations
Infrastructure and road projects
Oil and gas construction
Industrial facilities and utilities
Coastal and marine developments
Strong foundations start with stable ground, and that begins with effective dewatering. In Abu Dhabi’s challenging geological conditions, Arabian Equipment [AER] ensures construction sites remain dry, secure, and ready for progress. With proven systems, expert engineering, and a commitment to safety, AER’s dewatering solutions protect foundations and help build the UAE’s future on solid ground.

