AER - Arabian Equipment Staff

24 Dec 2025

The Risks, Costs and Consequences of Poor Groundwater Management and How Arabian Equipment Helps Prevent Them

Groundwater control is one of the most critical aspects of construction in Dubai and Abu Dhabi. High water tables, sandy soils and deep excavations mean that even a small failure in groundwater management can lead to serious structural, safety and financial consequences. When groundwater is not controlled correctly, entire projects can be placed at risk.

Arabian Equipment supports contractors across the UAE with engineered dewatering solutions that prevent groundwater related problems before they occur. This article explains what can happen when groundwater is not properly managed and why professional dewatering is essential.


1. Flooded Excavations and Work Stoppages

Without effective dewatering, groundwater quickly fills excavation pits. Flooded excavations prevent access for workers and machinery, forcing construction to stop until water is removed.

In Dubai and Abu Dhabi, where excavation schedules are tight, even short delays can disrupt entire project timelines.


2. Soil Instability and Excavation Collapse

Water saturated soil loses strength. When groundwater is not controlled, excavation walls can slump or collapse, placing workers and nearby structures at risk.

Unstable soil can lead to:

  • Excavation wall failure

  • Ground movement around the site

  • Damage to temporary shoring systems


3. Delays to Foundation and Concrete Works

Concrete works require dry and stable conditions. High groundwater interferes with:

  • Piling operations

  • Raft foundation placement

  • Concrete curing

This leads to rework, wasted materials and extended schedules.


4. Increased Safety Risks

Standing water increases the risk of slips, equipment instability and electrical hazards. Inadequate groundwater control can create unsafe working conditions that may result in accidents or site shutdowns.


5. Damage to Nearby Structures and Utilities

Uncontrolled groundwater can cause settlement or movement in surrounding ground. This may affect:

  • Adjacent buildings

  • Roads and pavements

  • Underground utilities

Such damage can result in costly repairs and legal disputes.


6. Environmental and Regulatory Violations

Improper discharge of groundwater can cause erosion, flooding of nearby areas or environmental contamination. In Dubai and Abu Dhabi, this may lead to fines or stop work orders from authorities.


7. Higher Project Costs

Poor groundwater control increases costs through:

  • Extended rental periods

  • Additional labour

  • Emergency pumping

  • Equipment damage

  • Project delays

These costs often exceed the cost of proper dewatering design and installation.


How Arabian Equipment Prevents These Problems

Arabian Equipment provides complete groundwater control solutions that protect construction projects from these risks.

Engineering Based Dewatering Design

Systems are designed using soil data and groundwater behaviour to ensure reliable performance.

Correct System Selection

Arabian Equipment provides wellpoint, deep well and submersible pump systems based on site requirements.

Accurate Pump Sizing

Pumps are sized to handle continuous inflow without interruption.

Safe and Compliant Discharge Planning

Water discharge is managed to meet environmental and regulatory requirements.

Monitoring and Technical Support

Systems are monitored throughout excavation to prevent sudden water rise or failure.


Why Contractors Choose Arabian Equipment

Contractors across Dubai and Abu Dhabi rely on Arabian Equipment because they offer:

  • Proven experience with high groundwater conditions

  • Reliable and well maintained equipment

  • Engineering level system design

  • Fast mobilisation and emergency support

  • Compliance with UAE safety and environmental standards

This ensures groundwater is controlled safely and efficiently from start to finish.

Failing to control groundwater properly on Dubai and Abu Dhabi construction sites can result in flooding, instability, safety hazards and major financial losses. Professional dewatering is essential to protect excavation integrity and maintain project schedules.

With expert planning, reliable equipment and continuous support, Arabian Equipment helps contractors avoid the risks associated with poor groundwater control and ensures successful project delivery.

Greyblue-faded-background-three-.jpg

READY TO DISCUSS YOUR NEXT PROJECT?

THANKS FOR YOUR ENQUIRY,
ONE OF OUR TEAM WILL BE IN TOUCH...

OR, IF YOU PREFER, SEND US A MESSAGE HERE 
AND ONE OF OUR EXPERT TEAM WILL GET BACK TO YOU SHORTLY. 

new-footer.jpg

Arabian Equipment Rental (AER)

HEAD OFFICE

Office 232

2nd Floor, Zone-2

Central Plaza Building

Schon Business Park

Dubai Investment Park 1

Dubai • United Arab Emirates

bottom of page