AER - Arabian Equipment Staff
7 May 2025
A Guide by Arabian Equipment on Navigating Dewatering Approvals and Compliance Across the UAE
Introduction
Before starting any dewatering activity in the UAE, contractors are required to obtain specific permits and comply with environmental and municipal regulations. Failing to do so can lead to work stoppage, fines, or delays in project approvals. This blog outlines the key permits, procedures, and responsibilities involved in legal dewatering operations across the Emirates, and how Arabian Equipment [AER] can support the process.
Why Dewatering Requires Permits in the UAE
Groundwater extraction and discharge affect the environment and municipal infrastructure. To protect public utilities, underground services, and surrounding ecosystems, UAE authorities require detailed plans, water testing, and prior approvals for any dewatering activity.
Key Authorities Involved in Dewatering Permits
Depending on the location and type of project, contractors may need approval from multiple bodies, including:
Municipalities such as Dubai Municipality or Abu Dhabi Municipality
Roads and Transport Authority RTA for road or infrastructure projects
Environmental Agencies such as EAD in Abu Dhabi or Dubai's Environment Department
Project Consultants or Developers for NOC coordination
Utility Companies such as DEWA, ADDC, or Etisalat if discharge affects their network
Each authority has its own requirements for submission and approval timelines.
Main Steps to Obtain Dewatering Permits
Site Assessment
Evaluate the groundwater level, soil type, and flow rate to determine the appropriate dewatering method.
Prepare Technical Documentation
Submit layout plans, method statements, water discharge flow estimates, and equipment specifications. These documents must be stamped by a licensed consultant.
Water Quality Testing
Samples of the extracted water may need to be tested for pH, turbidity, oil content, or chemical pollutants before discharge is approved.
Apply for NOCs and Permits
Submit the documentation to relevant authorities through their portals or consultants.
Comply with Discharge Guidelines
You may be assigned a specific discharge point or be required to use filtration or sediment tanks before releasing water into drainage systems.
Regular Monitoring
Ongoing projects are often subject to site inspections and flow reporting.
Common Mistakes That Delay Approval
Submitting incomplete documentation
Not appointing a qualified consultant
Discharging water without prior permission
Failing to monitor and report flow rates or water quality
These errors can lead to penalties or the suspension of site works.
How Arabian Equipment [AER] Supports Contractors
At Arabian Equipment, we do more than supply pumps and hoses. We work closely with clients to:
Provide technical specifications and pump data for submission
Recommend the right dewatering system based on flow rate and soil condition
Coordinate with your engineering consultant to meet permit criteria
Offer on-site water quality solutions such as filtration tanks or silt bags
Support emergency setups that meet municipal requirements
Conclusion
Dewatering in the UAE is not just a technical task. It is a regulated process that demands careful planning, proper documentation, and full compliance. Contractors must stay informed about local requirements and work with experienced partners to avoid costly delays.